Town Zoning Application

Download Form: TownZoningApplication.pdf

The only County Building Permits that will be issued without a Town of Castile Zoning Permit will be for solid fuel.
A County Building Permit is not required for the typical small movable metal or wood storage building under 150 square feet, but required a Town of Castile Zoning Permit.
No county building permits will be issued until a Town Zoning Permit is obtained.
Things you will need for the Town Zoning Permit:
1. Application completely filled out.
2. Proof of ownership of property.Only the owner of property can obtain a Town Zoning Permit.
3. Plot Plan or Site Plan. Plan must show size of lot and distance from all property lines for existing and proposed buildings.
4. Permit fee.
5. Is this property in a flood zone?  Yes--No--
Note: Time will be required to check plans for compliance with Town of Castile Zoning Law. Every effort will be made to either issue or permit or notify applicant of any required changes within five working days after receiving the application. Please plan starting dates accordingly.